| |
2004 Master Plan Enhancements |
|
|
| |
0 |
Introduction |
|
|
| |
1.0 |
Flow
and Rainfall Monitoring |
|
|
| |
2.0 |
Hydraulic
Model Update |
|
Fig
2-1 |
| |
3.0 |
Colorado
Centre Analysis |
|
Fig
3-1 |
| |
4.0 |
Lift
Station Analysis |
|
Fig
4-1, Table
4-1 |
| |
5.0 |
Hydraulic
Model Review |
|
|
| |
6a |
WWTP
Process Evaluation |
|
|
| |
6b |
WWTP
Options |
|
|
| |
7.0 |
Admin
and Operations Analysis |
|
Fig
7-1 |
| |
|
|
|
| |
|
Appendix 1A |
|
|
| |
|
Appendix
2A |
|
|
| |
|
Appendix
2B |
|
|
| |
|
Appendix
2C |
|
|
| |
|
|
|
| 1.0 |
Introduction |
|
1-1 |
| |
1.1 |
Introduction |
1-1 |
| |
1.2 |
Scope
of Study |
1-2 |
| |
1.3 |
Study
Area |
1-3 |
| |
1.4 |
Previous
Reports |
1-3 |
| |
1.5 |
Abbreviations |
1-5 |
| |
|
|
|
| 2.0 |
Wastewater
Flows |
2-1 |
| |
2.1 |
Introduction |
2-1 |
| |
2.2 |
Flow
Components |
2-1 |
| |
2.3 |
Flow
and Rainfall Monitoring Program |
2-2 |
| |
2.3.1 |
Location
of Monitoring Stations |
2-2 |
| |
2.3.1.1 |
Temporary
Flow Monitors |
2-2 |
| |
2.3.1.2 |
Rainfall
Gauges |
2-5 |
| |
2.3.2 |
Flow
and Rainfall Monitoring Equipment |
2-5 |
| |
2.3.2.1 |
Temporary
Flow Monitoring |
2-5 |
| |
2.3.2.2 |
Rain
Gauge Network |
2-6 |
| |
2.3.3 |
Monitoring
Methodology |
2-6 |
| |
2.3.3.1 |
Pre-Installation
Calibration |
2-6 |
| |
2.3.3.2 |
Installation
Procedures |
2-6 |
| |
2.3.3.3 |
Monitoring |
2-7 |
| |
2.3.3.3.1 |
Quality
Assurance |
2-7 |
| |
2.3.3.3.2 |
Flow
Monitoring |
2-7 |
| |
2.3.4 |
Preliminary
Data Analysis and Review |
2-8 |
| |
2.3.4.1 |
Flow
Monitor Profiling and Calibration |
2-8 |
| |
2.3.4.2 |
Subsystem
Areas |
2-10 |
| |
2.4 |
Rainfall
Data Analysis |
2-10 |
| |
2.4.1 |
Design
Flow and Probability |
2-10 |
| |
2.4.2 |
Analysis
of Rainfall Data |
2-11 |
| |
2.4.2.1 |
Background |
2-11 |
| |
2.4.2.2 |
Monitored
Rainfall |
2-14 |
| |
2.5 |
Flow
Data Analysis |
2-16 |
| |
2.5.1 |
Flow
Monitoring Data |
2-16 |
| |
2.5.1.1 |
Determination
of Average Daily Dry Weather Flow |
2-16 |
| |
2.5.1.2 |
Determination
of Infiltration |
2-17 |
| |
2.5.1.3 |
Determination
of Inflow |
2-18 |
| |
2.5.2 |
Summary
of Existing Flows |
2-20 |
| |
2.6 |
Historical
WWTP Flows |
2-21 |
| |
2.6.1 |
Large
User Flows |
2-22 |
| |
|
|
|
| 3.0 |
Population,
Land Use, and Flow Projections |
3-1 |
| |
3.1 |
Introduction |
3-1 |
| |
3.2 |
Current
Population |
3-1 |
| |
3.3 |
Future
Population |
3-2 |
| |
3.4 |
Current
and Future Land Use |
3-4 |
| |
3.5 |
Future
Wastewater Flow Projections |
3-9 |
| |
3.5.1 |
Design
Flow Curve |
3-9 |
| |
3.5.2 |
Projected
Wastewater Flows |
3-11 |
| |
|
|
|
| 4.0 |
Existing
Facilities |
4-1 |
| |
4.1 |
Introduction |
4-1 |
| |
4.2 |
Wastewater
Treatment Facility |
4-1 |
| |
4.3 |
Collection
System Facilities |
4-3 |
| |
4.3.1 |
Sanitary
Sewer Inventory |
4-3 |
| |
4.3.2 |
Flow
Split Manholes |
4-4 |
| |
4.3.3 |
Wastewater
Pumping Stations and Force Mains |
4-4 |
| |
4.3.4 |
Colorado
Centre Pumping Station and Force Main |
4-5 |
| |
|
|
|
| 5.0 |
Wastewater
Treatment Plant Discussion |
5-1 |
| |
|
|
|
| 6.0 |
Collection
System Evaluation |
6-1 |
| |
6.1 |
Hydraulic
Model |
6-1 |
| |
6.2 |
Model
Calibration |
6-2 |
| |
6.3 |
Collection
system Improvement Criteria |
6-2 |
| |
6.4 |
Improvements
Cost Basis |
6-3 |
| |
6.5 |
Existing
System Analysis for Peak Flow Conditions |
6-5 |
| |
6.6 |
Design
Year 2010 and Build-out Hydraulic Capacity Evaluation |
6-7 |
| |
6.7 |
Compatibility
of FSD's Maintenance Program with SSO Rule and CMOM
Requirements |
6-11 |
| |
6.7.1 |
Sanitary
sewer Overflow (SSO) Rule |
6-12 |
| |
6.7.2 |
CMOM
Regulations |
6-12 |
| |
6.7.3 |
FSD
System Evaluation |
6-14 |
| |
6.7.3.1 |
FSD
Questionnaire Response |
6-14 |
| |
6.7.3.2 |
FSD
Evaluation |
6-15 |
| |
6.7.3.3 |
Impact
of Proposed SSO Rule and CMOM Requirements on
FSD's Operation |
6-16 |
| |
|
|
|
| 7.0 |
Implementation
Plan |
7-1 |
| |
7.1 |
Introduction |
7-1 |
| |
7.2 |
Relief
Sewers |
7-3 |
| |
7.3 |
Extension
Sewers |
7-5 |
| |
7.4 |
Pumping
Stations and Force Mains |
7-6 |
| |
7.5 |
SSO
Rule and CMOM Program Requirements |
7-8 |
| |
7.6 |
Wastewater
Treatment Plant Hydraulic Capacity |
7-9 |
| |
7.7 |
Summary
of Costs |
7-10 |
| Table
2-1 |
Temporary
Flow Metering Sites |
2-5 |
| Table
2-2 |
Rainfall
Gauge Locations |
2-5 |
| Table
2-3 |
Temporary
Monitoring Site Descriptions |
2-8 |
| Table
2-4 |
Developed
Areas by Flow Monitor Drainage Area |
2-10 |
| Table
2-5 |
Probability
of Non-Exceedance |
2-11 |
| Table
2-6 |
Historical
Monthly Precipitation |
2-12 |
| Table
2-7 |
Rainfall
Depth - Duration - Frequency Relationship, Fountain, CO |
2-12 |
| Table
2-8 |
Monitored
Rainfall Totals |
2-15 |
| Table
2-9 |
Monitored
Peak Rainfall Intensities vs. Duration for Selected Storms |
2-15 |
| Table
2-10 |
Subsystem
ADDF and Peak Dry Weather Flow Summary |
2-17 |
| Table
2-11 |
ADDF
and Total Infiltration Flows |
2-18 |
| Table
2-12 |
Summary
of Inflow Parameters |
2-19 |
| Table
2-13 |
Existing
System Flow Summary |
2-20 |
| Table
2-14 |
Historical
WWTP Monthly Average Flows |
2-21 |
| Table
3-1 |
Year
2000 Population |
3-2 |
| Table
3-2 |
Future
Population |
3-3 |
| Table
3-3 |
Known
Planned Developments |
3-5 |
| Table
3-4 |
Future
Land Use |
3-7 |
| Table
3-5 |
Land
Use Based Unit Flow Rates |
3-9 |
| Table
3-6 |
Design
Year Flow Projection Summary |
3-11 |
| Table
4-1 |
Modeled
Pipe Length |
4-4 |
| Table
5-1 |
Projected
ADF Flows |
5-1 |
| Table
6-1 |
Model
Calibration - Peak 1-Year Storm Flows at Monitor Locations |
6-2 |
| Table
6-2 |
Wastewater
Sewer Pipe Unit Construction Cost |
6-4 |
| Table
6-3 |
Wastewater
Force Main Construction Costs |
6-4 |
| Table
6-4 |
Wastewater
Pump Station Construction Cost |
6-5 |
| Table
6-5 |
Pipe
Surcharge and Overloading Summary Existing System Analyses |
6-7 |
| Table
6-6 |
Pipe
Surcharge and Overloading Summary Design Year 2010 Analyses |
6-9 |
| Table
6-7 |
Pipe
Surcharge and Overloading Summary Build-out Analyses |
6-11 |
| Table
7-1 |
Recommended
Relief Sewers |
7-4 |
| Table
7-2 |
Recommended
Sewer Extensions |
7-5 |
| Table
7-3 |
Recommended
Pump Station Improvements |
7-8 |
| Table
7-4 |
Recommended
Force Main Improvements |
7-8 |
| Table
7-5 |
Summary
of Probable Capital Costs |
7-10 |